Commission awards Cheyenne company bridge project

Posted

LINGLE – The Goshen County Board of Commissioners voted unanimously on July 2 to award Reiman Corp., a Cheyenne company, with a bid to install a pre-fabricated bridge over Wiley Draw north of Lingle. 

According to county engineer Bob Taylor, the county received two bids for the project. 

“We opened bids for the FAB bridge structure, the prefabricated bridge, that we’re going to install over Wiley Draw North of Lingle,” Taylor said. “Yesterday, we received two bids – one from Reiman Corp. and one from Dietzler Construction. I have a recommendation of award here in my hands, which summarizes that information.”

Reiman Corp.’s bid came in at $154,518.50. Dietzler Construction, the Yoder company that is currently overhauling the frontage road that runs parallel to US 26 in east Torrington, valued the project at $185,134. 

Reiman Corp. has a long history of large projects, including several large bridge projects listed on their website, reimancorp.com/.

“The low bidder, after going through all of the documents that were submitted and going over them to make sure their numbers were correct, was Reiman Corp,” Taylor said. “That is who we would recommend awarding the bid to.”