From the
organisers of
Hillhead logo

COVID-19: Rapid concrete solution for Cardiff field hospital

Hanson concrete delivery

Effective collaboration sees Hanson deliver high-strength concrete within tight time frame

HANSON have worked with contractors Mike Amodeo Ltd to develop a rapid concrete solution for the installation of essential oxygen tanks at the Principality Stadium in Cardiff, South Wales.

A high-strength concrete required to form the bases of two large liquid oxygen tanks, as part of the site’s conversion into the 2,000-bed Dragon’s Heart field hospital, needed to be delivered within a tight timescale to support increased demands caused by the COVID-19 pandemic.

 

Close customer collaboration and Hanson’s technical ability to provide a fast-track mix that would provide early strength and allow quicker construction were crucial to meeting the project’s needs.

Lee Jones, Hanson Concrete’s territory sales manager for South Wales, said: ‘We supplied 87 cubic metres of concrete for the bases and early strength of 30N/m was achieved within 24 hours of pouring, allowing the tanks to be installed and operational within the space of a weekend.

‘The project took just one week to complete – from contractor enquiry through to approval and supply – and is a great example of what effective collaboration can achieve.’

The Dragon’s Heart emergency coronavirus field hospital is the largest in Wales and the second largest in the UK.

 

Latest Jobs

Civil Engineer (Quarries)

Forestry and Land Scotland (FLS) is seeking a Civil Engineer (Quarries) for their South Region, to manage the quarries and stone production programme